Main Business

  • Sunshine Coast Greenway Floating Bridge Project
Sunshine Coast Greenway Floating Bridge Project
Update time:2021-04-13

———

The project consists of two sections with a total length of 402 meters.The upper part of the bridge body is a single-span curved double-span steel box girder structure, and the lower part is a steel support leg structure.The bridge deck is 6 meters wide, with 25 spans of 12 meters, 6 spans of 17 meters, 23 sets of steel legs and 2 sets of stairways, with a total steel volume of 1482 tons.
Inquiry

→Product Introduction


The project consists of two sections with a total length of 402 meters.The upper part of the bridge body is a single-span curved double-span steel box girder structure, and the lower part is a steel support leg structure.The bridge deck is 6 meters wide, with 25 spans of 12 meters, 6 spans of 17 meters, 23 sets of steel legs and 2 sets of stairways, with a total steel volume of 1482 tons.